TABLE OF
CONTENTS
Noise
(Ap Lei Chau PTW)
Air
Quality and Noise (Aberdeen PTW)
Background
Purpose
of the Report
Structure
of the Baseline Monitoring Report
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Results
and Observations
Action
and Limit Levels
3 REVISIONS FOR INCLUSION IN
THE EM&A MANUAL
LIST
OF TABLES
Table 2.1 Location
of Noise Monitoring Station
Table 2.2 Noise
Monitoring Equipment
Table 2.3 Frequency
and Parameters of Noise Monitoring
Table 2.5 Summary
of Daytime Noise Monitoring Results (Normal Weekdays)
Table 2.6 Summary
of Evening-Time & Daytime (Holidays) Noise Monitoring Results
Table 2.7 Summary
of Night-Time Noise Monitoring Results
Table 2.8 Action
Limit Levels for Noise during Construction Period
LIST
OF FIGURE
Figure 2 Locations
of Baseline Monitoring Station
LIST
OF APPENDICES
Appendix A1 Day-time
Baseline Noise Monitoring Data
Appendix A2 Evening-time and Holidays Baseline Noise Monitoring Data
Appendix A3 Night-time Baseline Noise Monitoring Data
Appendix A4 Graphical
Presentation of Baseline Noise Levels
Appendix A5 Copies
of Calibration Certificates for Noise Monitoring Equipment